Geneva College

 

 

Geneva improves its G

FOR IMMEDIATE RELEASE
Aug. 1, 2005

g.jpgBEAVER FALL, Pa. – Geneva’s maintenance crew began laying the stones for the new G on Eastvale’s hillside today. Dr. Kenneth Smith, president of Geneva, joined the crew to assist with the positioning of the base of the G.

     The new G will be three times larger than the previous G and will be illuminated by solar powered lights at night. The 30 feet by 50 feet clearing on the Eastvale hillside is located just north of its previous location. The G is 20 feet by 40 feet and is built from 90 2 feet by 2 feet flagstones, which are secured on the 40 degree grade by steel bars.

     The G has been on Eastvale’s hillside since 1925 and has inspired several college traditions. College freshman are first introduced to the G during orientation when they hike up Eastvale hill to help clear the area for the new semester. During the fall semester, the G is illuminated with road flares during the halftime of home football games.

     The college plans to have the G completed by the Friday, Aug 5.

- END -


 

Point of Excellence

Geneva College placed in the Top 20 Regional College North Rankings as identified by U.S. News & World Report.

more points >>
 
Upcoming Events
Dec06
The Genevans Christmas "Glad Tidings" Concert
1st Presbyterian Church, Beaver Falls 7:00 p.m.

ARTS & CULTURE
The Genevans welcomes Christmas season with “Glad Tidings!”
The ensemble will perform its annual Christmas concerts on Dec. 5 and 6.
CURRENT STUDENTS
Geneva vocalists perform well at Tri-State competition
Five music majors competed against peers from PA, OH and WV.
ARTS & CULTURE
Geneva Reading Series: Nostalgia
Literary and musical talent will be on display on Wed., Nov. 19 at 7 p.m.
ATHLETICS
Cornuet remembers brother with help from football
Reprinted with permission from the Beaver County Times.
ATHLETICS
Athletic Department adds three programs
Geneva’s list of varsity sports expands to include Men’s and Women’s Golf and Men’s Tennis.