Geneva College

 

 

Geneva improves its G

FOR IMMEDIATE RELEASE
Aug. 1, 2005

g.jpgBEAVER FALL, Pa. – Geneva’s maintenance crew began laying the stones for the new G on Eastvale’s hillside today. Dr. Kenneth Smith, president of Geneva, joined the crew to assist with the positioning of the base of the G.

     The new G will be three times larger than the previous G and will be illuminated by solar powered lights at night. The 30 feet by 50 feet clearing on the Eastvale hillside is located just north of its previous location. The G is 20 feet by 40 feet and is built from 90 2 feet by 2 feet flagstones, which are secured on the 40 degree grade by steel bars.

     The G has been on Eastvale’s hillside since 1925 and has inspired several college traditions. College freshman are first introduced to the G during orientation when they hike up Eastvale hill to help clear the area for the new semester. During the fall semester, the G is illuminated with road flares during the halftime of home football games.

     The college plans to have the G completed by the Friday, Aug 5.

- END -


 

Point of Excellence

A great majority of Geneva students – 70% – complete internships during the course of their study.

more points >>
 
Upcoming Events
PROSPECTIVE STUDENTS
Johnstown Open House for Master's in Organizational Leadership
The event will be held from 5 p.m. to 7 p.m. at the Johnstown Industrial Development Inc. on July 30.
PUBLICATIONS
July issue of @Geneva
Read about Proactive Stewardship.
COMMUNITY EVENTS
Beaver Falls Community Crime Watch Day
On Sat., Aug 2, this popular annual event kicks off in a new way.
PUBLICATIONS
June issue of @Geneva
Read about chemistry program grants.
INCOMING STUDENTS
Freshman Expedition registration is open
First-year students can meet new friends and prepare for the college transition prior to Welcome Week through outdoor adventure activities.