Geneva College

 

 

Geneva improves its G

FOR IMMEDIATE RELEASE
Aug. 1, 2005

g.jpgBEAVER FALL, Pa. – Geneva’s maintenance crew began laying the stones for the new G on Eastvale’s hillside today. Dr. Kenneth Smith, president of Geneva, joined the crew to assist with the positioning of the base of the G.

     The new G will be three times larger than the previous G and will be illuminated by solar powered lights at night. The 30 feet by 50 feet clearing on the Eastvale hillside is located just north of its previous location. The G is 20 feet by 40 feet and is built from 90 2 feet by 2 feet flagstones, which are secured on the 40 degree grade by steel bars.

     The G has been on Eastvale’s hillside since 1925 and has inspired several college traditions. College freshman are first introduced to the G during orientation when they hike up Eastvale hill to help clear the area for the new semester. During the fall semester, the G is illuminated with road flares during the halftime of home football games.

     The college plans to have the G completed by the Friday, Aug 5.

- END -


 

Point of Excellence

The first biopsychology major graduated in 2012 and has been hired as an IOM Tech in UPMC’s Center for Clinical Neurophysiology (CCN).

more points >>
 
Upcoming Events
Aug25
Fall Semester Begins
The Fall semester of the 2014-2015 school year begins.
 8:00 a.m.

Aug29
MSOL at PNC Park
 7:05 p.m.

ABOUT GENEVA
Geneva College named a College of Distinction
National college guide honors distinctive educational excellence
ABOUT GENEVA
Geneva College announces 5% budget cuts
Commitment to stewardship helps keep a Geneva College education affordable.
PUBLICATIONS
July issue of @Geneva
Read about Proactive Stewardship.
COMMUNITY EVENTS
Beaver Falls Community Crime Watch Day
On Sat., Aug 2, this popular annual event kicks off in a new way.
PUBLICATIONS
June issue of @Geneva
Read about chemistry program grants.